BTF Group, Building the Future

The tank loop

Industrial Instrumentation, Module 1 · one water tank, four jobs: sense, signal, decide, act
SP draw-off LV-101 50 % open 4 · ACT LT 101 49.05 kPa 1 · SENSE 12.00 mA 2 · SIGNAL LIC 101 3 · DECIDE REVERSE acting controller output to the valve

Where the tank loop sits in a project's life: the V-Model

Nine project phases (typical EPCM names), folded into a V. Down the left leg we verify the design; up the right leg we validate the product. Each box on the left is tested by the box across from it. Pick a box, or a phase in time order below; the amber glow marks the parts of the loop involved.

↓ Verify the design“Are we building it right?”
↑ Validate the product“Did we build the right thing?”

In time order:

Teaching model, not a plant simulation: a 0–5 m open water tank (1000 kg/m³, g = 9.81 m/s²), a PI controller, a constant disturbance you switch on or off. Formulas shown on the page: p = ρ·g·h; mA = 4 + 16 × level ÷ 5; error = SP − PV. Reverse acting: output falls as PV rises (right for a valve on the inlet). Direct acting: output rises as PV rises (right for a valve on the outlet). Tag bubbles are drawn plain; the ISA 5.1 bubble-line conventions are not applied.