Underground cabling can cost around ten times as much as overhead lines, and take longer to deliver. Faults are also harder to find and fix. That was the claim in a short reel in which an engineer answered a Welsh energy committee’s question about overhead lines versus underground cable. The engineer is right, and electromagnetic (EM) theory explains why.

Watch the reel on Instagram ↗

Bottom line

The extra cost of putting cable underground comes from physics. When you bury a conductor you change its electromagnetic environment. It turns from a mostly inductive line into a strongly capacitive one.

Overhead line Underground cable
Insulation Air Solid (such as XLPE)
Capacitance about 10 nF/km about 0.2 µF/km (roughly 20 times more)
Characteristic impedance about 300 Ω about 40 Ω
Charging current at 400 kV about 0.7 A/km about 14 A/km
Reactive power at 400 kV about 0.5 Mvar/km about 10 Mvar/km
Heat removal Air carries it away Must conduct through insulation and soil
After a fault Flashover clears, line recloses Permanent damage: locate, dig, cut and joint

The charging figures are computed from the capacitance values, as shown at the end of this article.

Working back to first principles

1. Capacitance goes up by roughly 20 times because of insulation

You get about 0.2 µF/km for a cable against about 10 nF/km overhead. Insulation instead of air.

2. This means the cable “charges itself”

The charging current is I = ωCV, where V is the phase voltage. At 400 kV that is roughly 14 A and about 10 Mvar per km, before any load flows. Over a few tens of km the charging current eats up a large share of the cable’s thermal rating, so you need shunt reactors along the route.

This explains the stations the engineer refers to. For long distances that is why HVDC is used instead of AC.

3. Characteristic impedance falls from about 300 Ω to about 40 Ω

Impedance Z₀ = √(L/C). It falls because L drops (the conductors sit close together) and capacitance increases (the insulation).

The cable’s natural loading is far above what it normally carries, so at ordinary loads it pushes out reactive power and voltage control becomes harder. In short: an overhead line is roughly self-balancing at normal loads, while a cable is permanently over-charged and needs shunt reactors along the route to keep its voltage under control.

4. Faraday works against you in the sheath

The phase currents induce voltages in the metallic sheaths. Without cross-bonding, circulating currents flow and cause losses and heating. That means more joints, link boxes and cost.

5. Heat has nowhere to go

In air, I²R losses are carried away by convection. Underground they have to conduct through the insulation and the soil. The cable is derated, so you need bigger conductors, wider trench spacing and sometimes special backfill.

6. Why faults are harder to find and fix

Air is self-restoring insulation: a flashover clears and the line recloses. Solid insulation is not, so a breakdown is permanent damage.

To find it you use travelling-wave or time-domain reflectometry (TDR) methods. The wave speed is v = 1/√(LC), about two-thirds of the speed of light in XLPE. Then you dig, cut and joint. That takes weeks, not hours. Hence underground HV links are often built in tunnels or ducts, where crews can reach them.

The other side of the argument

The sheath screens the electric field completely, and the magnetic field falls off quickly to the side of the trench. Undergrounding is the right call for short urban, scenic or constrained sections. It isn’t the right default for bulk transmission.

The trade-off isn’t overhead versus underground. It’s where each one’s physics earns its cost.

Check the numbers yourself

For a 400 kV, 50 Hz system with a cable at 0.2 µF/km:

  • Angular frequency: ω = 2π × 50 = 314.2 rad/s
  • Phase voltage: 400 kV ÷ √3 = 230.9 kV
  • Charging current: I = ωCV = 314.2 × 0.2 × 10⁻⁶ × 230.9 × 10³ = 14.5 A per km
  • Reactive power: Q = √3 × 400 kV × 14.5 A = 10.05 Mvar per km
  • The same arithmetic for an overhead line at 10 nF/km gives 0.73 A/km and 0.50 Mvar/km, which is the 20-times difference in capacitance carried straight through.

The charging current adds up with length: about 290 A over 20 km, 730 A over 50 km and 1,450 A over 100 km. That is why a long AC cable runs out of capacity for useful load, and why reactors or HVDC enter the picture.