Articles / Safety

How to set a SIL target: start from the explosion, a LOPA worked example

24 November 20263 min read

Here is how to end up with the wrong SIL target: count protection that is not really there.

Take a hazard. List every layer of protection you can think of. Give each one full credit, including the operator who is also the person who caused the problem. The target comes out low and comfortable. The plant is now less safe than the paperwork says.

Now run that backwards. A SIL target is not a feature of the safety function. It is the answer to a question about the hazard: how much risk is left for this function to remove?

This is part of the series that starts with How a SIL calculation works, whose function was set at SIL 2 by a layer of protection analysis. Here is that analysis. The numbers are illustrative, not from a client, and every company sets its own tolerable risk.

The narrated walkthrough, about two minutes, with a synthetic voice.

The scenario

SIF-101 protects a vessel against high pressure. Layer of protection analysis (LOPA) works with frequencies, in events per year.

Step Value
Initiating event: the pressure control loop fails 0.1 per year
Layer 1: operator responds to an independent high-pressure alarm probability of failure 0.1
Conditional modifier: a release ignites 0.3
Mitigated event frequency without SIF-101 0.1 × 0.1 × 0.3 = 0.003 per year
Tolerable frequency for this consequence 2×10⁻⁵ per year

From hazard to target

The safety function must close the gap between 0.003 and 2×10⁻⁵ per year:

required PFD = tolerable ÷ mitigated = 2×10⁻⁵ ÷ 0.003 = 0.0067

That is a risk reduction factor of 150, and it sits in the SIL 2 band (0.001 to 0.01). It is the origin of the SIL 2 target in the worked example.

Check the result against the achieved number. SIF-101 has PFDavg = 0.0050274, so the function brings the event down to 0.003 × 0.0050274 = 1.51×10⁻⁵ per year, under the 2×10⁻⁵ tolerable. The margin is 1.33 times. The SIL band is not the requirement. The requirement is 0.0067, and the function must beat it.

Move one assumption

What changes Required PFD Risk reduction factor Target
As worked 0.0067 150 SIL 2
The operator is not independent, so no credit for layer 1 0.00067 1,500 SIL 3
Layer 1 is over-credited, at 0.01 instead of 0.1 0.067 15 SIL 1

One line of credit moves the target by a whole SIL, in either direction. Over-credit a layer and the function you build is too weak. Refuse a layer that does not deserve credit and you build the one the hazard really needs.

What qualifies as a layer of protection

A layer earns credit only if it is independent of the initiating event and of the other layers, effective against the scenario, and auditable. An alarm that comes from the same failed instrument as the cause, or an operator who has no time to respond, fails the test.

What this simple model leaves out

Real LOPA studies use company risk criteria, several consequences per scenario, and carefully sourced frequencies. This is a teaching example of the arithmetic, not a risk assessment.

Which protection layers on your plant would still stand if each one had to prove it is independent?