Articles / Safety

What happens to a SIL rating when a proof test is skipped?

22 November 20265 min read

How do you turn a SIL 2 safety function into a SIL 1 function without touching a single wire, a single valve or a single line of code?

You let the proof test slip. Twice.

Nobody sets out to do it. The plant is busy. The next shutdown is not until next year. The test needs the unit stopped, and the unit is making money. So the test is put off, “just this once”. And the calculation that said the function was SIL 2 quietly stops being true. Nobody tells it.

This article puts numbers on “just once”, and lets you try it yourself.

The function we are testing

It is the same example as in How a SIL calculation works: a pressure sensor, a logic solver and a shutdown valve. Tested once a year, the average chance that it fails when it is needed (the PFDavg) is 0.0050274. That is about 5 failures in every 1,000 demands, comfortably inside the SIL 2 band (0.001 to 0.01).

The numbers are illustrative, not from a client.

Why a test matters at all

A safety device can fail in two dangerous ways. Some failures the device spots for itself, and they get repaired within hours. Others are silent. The valve is stuck, nobody knows, and it stays stuck until the day the plant needs it to move.

A proof test is the only thing that finds a silent failure before that day. It is pressing the test button on a smoke alarm. Every month you do not press it, the chance that the battery is dead creeps up.

The formula says the same thing in one line. The silent part of the risk is the silent failure rate times half the test interval. Double the interval and you double that part. It grows in a straight line, quietly, while nobody is looking.

What skipping does

What happened Test interval PFDavg Failures per 1,000 demands Result
Tested on time 12 months 0.0050274 5.03 SIL 2, using 50% of the limit
One test skipped 24 months 0.0098892 9.89 SIL 2, using 98.9% of the limit
Two tests skipped 36 months 0.0147510 14.75 SIL 1
Only the valve skips two valve 36, others 12 0.0102834 10.28 SIL 1

Look at the second row. One skipped test, and the function is still SIL 2. The document on the shelf would still say so. But it is now using 98.9% of its allowance, with 1.1% to spare. A small error in the data, and it is gone.

Look at the last row. The valve carries 54% of this function’s silent failure rate. Skip its test twice, keep every other test on time, and the whole function drops out of SIL 2 by itself.

The longest single interval that keeps all three devices inside SIL 2 is about 24.3 months. That is why one skip uses almost all of the slack: the plant started at 12.

Try it

Start with Skip one test, then press Skip two tests. Then go back to Tested on time and drag only the valve slider. You should find that the valve alone, on its own, takes the function out of SIL 2 at about 35 months.

Three things to notice

  1. The margin disappears faster than it feels. Going from 12 to 24 months looks like a small step on a calendar. On the scale it moves the function from the middle of the band to the edge.
  2. Not every device is equal. The one that carries the most silent risk is the one whose test matters most. Ask which device that is on your plant, and when it was last tested.
  3. The paperwork does not change. Nothing on the page tells you the risk has moved. The only thing that moves is the number, and only if somebody recalculates it.

What this simple model leaves out

This is a teaching model, and an honest one should say what it ignores:

  • It assumes every proof test finds every silent failure. Real tests find most, not all, and what they miss keeps accumulating.
  • It leaves out common-cause failures, partial-stroke testing and failure rates that change as equipment ages.
  • It uses illustrative failure data, and a simplified form of the IEC 61511 low-demand calculation. It does not claim to certify or to replace a full verification.

Real SIL verification uses fuller calculations and real device data. Use this to see the shape of the problem, not to sign off a deferral. The simulator runs entirely in your browser, and nothing you enter is sent anywhere.

The rest of the series

This is the second article in a series on the worked SIL 2 example. The next ones go further into why the number is more fragile than it looks:

The full list starts with How a SIL calculation works.

Three questions to ask on your own plant

  • Which safety functions have a proof test overdue today, and by how long?
  • Who is allowed to defer a proof test, and do they see the new PFDavg before they sign?
  • Which single device carries the most silent risk, and is it the one tested least?

A skipped test is rarely one decision. It is a string of small, reasonable delays, each one understandable, none of them checked against the number that matters. The people who put a test off are not careless. They are busy, and nobody handed them the figure.

If a proof test were deferred on your plant tomorrow, would anyone recalculate the SIL before signing it off?